Projects
Explore project scopes, then discuss your own.
This preview contains illustrative project rows, not verified completed jobs. Prices and durations are placeholders. Filter by scope to find a relevant service; confirmed project records will be added separately.
The portfolio
Illustrative scopes, awaiting verified project records.
These example rows are not customer invoices or promised timelines. Completed-work evidence and homeowner permissions are required before publishing a real case.
| Project | Service | Final price | Duration | Location |
|---|---|---|---|---|
| Detached 1-bed cottage | ADU construction | $236,400 | 5 months | City, ST |
| Attached studio ADU | ADU construction | $148,900 | 4 months | City, ST |
| Detached 2-bed ADU | ADU construction | $372,000 | 7 months | City, ST |
| Two-car, one-bedroom unit | Garage apartment conversion | $138,600 | 4 months | City, ST |
| One-car studio | Garage apartment conversion | $84,200 | 3 months | City, ST |
| Apartment above garage | Garage apartment conversion | $231,000 | 6 months | City, ST |
| Den to bedroom suite | In-law suite construction | $58,700 | 8 weeks | City, ST |
| Lower level with kitchenette | In-law suite construction | $118,400 | 12 weeks | City, ST |
| Attached one-bedroom wing | In-law suite construction | $214,600 | 5 months | City, ST |
| Ranch family room, 320 sq ft | Home addition | $128,400 | 15 weeks | City, ST |
| Breakfast nook bump-out | Home addition | $46,900 | 8 weeks | City, ST |
| Bedroom and bath wing | Home addition | $236,000 | 22 weeks | City, ST |
| Colonial, ground-floor suite | Master suite addition | $186,300 | 19 weeks | City, ST |
| Suite over a two-car garage | Master suite addition | $228,700 | 21 weeks | City, ST |
| Compact ranch suite | Master suite addition | $118,900 | 15 weeks | City, ST |
| Deck screened under a gable | Screened porch addition | $34,700 | 4 weeks | City, ST |
| New porch on footings | Screened porch addition | $58,900 | 7 weeks | City, ST |
| Porch with stone fireplace | Screened porch addition | $104,300 | 11 weeks | City, ST |
| Ranch, full second floor | Second story addition | $412,000 | 8 months | City, ST |
| Suite over the garage | Second story addition | $198,500 | 6 months | City, ST |
| Bungalow, floor and rework | Second story addition | $587,000 | 10 months | City, ST |
| Four-season room on footings | Sunroom addition | $84,600 | 10 weeks | City, ST |
| Three-season room on a deck | Sunroom addition | $41,200 | 5 weeks | City, ST |
| Glass-roof garden room | Sunroom addition | $146,800 | 14 weeks | City, ST |
| Cape, attic office | Attic conversion | $52,300 | 9 weeks | City, ST |
| Colonial, bedroom suite | Attic conversion | $104,800 | 12 weeks | City, ST |
| Bungalow, shed dormer suite | Attic conversion | $168,500 | 15 weeks | City, ST |
| In-law suite for a mother | Basement apartment conversion | $82,400 | 10 weeks | City, ST |
| Legal one-bedroom unit | Basement apartment conversion | $146,800 | 15 weeks | City, ST |
| Unit with new side entrance | Basement apartment conversion | $214,300 | 20 weeks | City, ST |
| 850 sq ft rec room | Basement finishing | $46,200 | 6 weeks | City, ST |
| Family room, bedroom and bath | Basement finishing | $84,700 | 9 weeks | City, ST |
| Full level with bar and media | Basement finishing | $138,500 | 12 weeks | City, ST |
| Paneled den, cosmetic update | Basement remodeling | $21,600 | 4 weeks | City, ST |
| Strip and rebuild, 900 sq ft | Basement remodeling | $58,900 | 7 weeks | City, ST |
| New layout with rebuilt bath | Basement remodeling | $97,300 | 10 weeks | City, ST |
| Downspouts and regrading | Basement waterproofing | $3,400 | 1 day | City, ST |
| Interior drain on two walls | Basement waterproofing | $13,800 | 3 days | City, ST |
| Exterior membrane, one side | Basement waterproofing | $27,600 | 8 days | City, ST |
| Grab bars and comfort toilet | Accessible bathroom remodel | $7,900 | 4 days | City, ST |
| Tub to curbless shower | Accessible bathroom remodel | $24,600 | 12 days | City, ST |
| Bath enlarged for a wheelchair | Accessible bathroom remodel | $52,300 | 4 weeks | City, ST |
| Hall closet into a half bath | Bathroom addition | $31,700 | 5 weeks | City, ST |
| Basement full bath with pump | Bathroom addition | $68,400 | 8 weeks | City, ST |
| Main-floor bump-out bath | Bathroom addition | $137,500 | 14 weeks | City, ST |
| Hall bath full remodel | Bathroom remodeling | $34,600 | 4 weeks | City, ST |
| Guest bath refresh | Bathroom remodeling | $16,900 | 2 weeks | City, ST |
| Closet absorbed, new shower | Bathroom remodeling | $58,300 | 7 weeks | City, ST |
| Tub deck turned into a walk-in | Master bathroom remodel | $62,800 | 7 weeks | City, ST |
| Finish upgrade, same layout | Master bathroom remodel | $41,300 | 5 weeks | City, ST |
| Suite widened into the closet | Master bathroom remodel | $118,900 | 11 weeks | City, ST |
| 5 by 8 full redo, same layout | Small bathroom remodel | $22,400 | 3 weeks | City, ST |
| Half bath refresh with storage | Small bathroom remodel | $11,200 | 2 weeks | City, ST |
| Toilet moved, tub to shower | Small bathroom remodel | $39,800 | 5 weeks | City, ST |
| Panel shower, hall bath | Tub to shower conversion | $10,900 | 4 days | City, ST |
| Tiled shower with a niche | Tub to shower conversion | $18,700 | 2 weeks | City, ST |
| Low-threshold shower for a dad | Tub to shower conversion | $29,300 | 3 weeks | City, ST |
| Stall rebuilt in tile | Walk-in shower installation | $16,400 | 2 weeks | City, ST |
| Glass walk-in with a bench | Walk-in shower installation | $27,900 | 3 weeks | City, ST |
| Curbless with linear drain | Walk-in shower installation | $44,600 | 5 weeks | City, ST |
| Soaker in a hall bath | Walk-in tub installation | $9,800 | 1 day | City, ST |
| Therapy tub, new circuit | Walk-in tub installation | $16,400 | 3 days | City, ST |
| Tub, heater and new floor | Walk-in tub installation | $27,100 | 6 days | City, ST |
| Kitchen and two baths, order set | Design consultation | $750 | 1 week | City, ST |
| Can the wall come out, answered | Design consultation | $1,900 | 12 days | City, ST |
| First-home priorities visit | Design consultation | $300 | 1 visit | City, ST |
| Basement legalized before sale | Permit services | $6,800 | 5 weeks | City, ST |
| Kitchen permit with drawings | Permit services | $2,300 | 4 weeks | City, ST |
| Expired deck permit closed | Permit services | $950 | 2 weeks | City, ST |
| Kitchen and dining, 3D design | Remodeling design | $5,800 | 5 weeks | City, ST |
| Primary bath layout plan | Remodeling design | $2,400 | 3 weeks | City, ST |
| Whole first floor, permit set | Remodeling design | $14,500 | 8 weeks | City, ST |
| Kitchen, home equity line | Renovation financing assistance | $58,400 | 6 weeks | City, ST |
| Bath and roof, renovation loan | Renovation financing assistance | $47,900 | 7 weeks | City, ST |
| Kitchen in two phases, savings | Renovation financing assistance | $36,200 | 2 phases | City, ST |
| One-car to home office | Garage conversion | $33,800 | 6 weeks | City, ST |
| Two-car to guest bedroom | Garage conversion | $61,200 | 8 weeks | City, ST |
| Bedroom with shower bath | Garage conversion | $96,500 | 11 weeks | City, ST |
| Two-car finished garage | Garage remodel | $21,700 | 2 weeks | City, ST |
| Floor and storage refresh | Garage remodel | $8,400 | 4 days | City, ST |
| Woodworking shop garage | Garage remodel | $47,900 | 4 weeks | City, ST |
| Spare bedroom refit | Home office remodeling | $8,400 | 9 days | City, ST |
| Built-in office for two | Home office remodeling | $21,600 | 3 weeks | City, ST |
| Garage bay office | Home office remodeling | $46,900 | 6 weeks | City, ST |
| Basement laundry refresh | Laundry room remodel | $6,800 | 6 days | City, ST |
| Mudroom laundry remodel | Laundry room remodel | $16,400 | 2 weeks | City, ST |
| Laundry moved upstairs | Laundry room remodel | $29,700 | 4 weeks | City, ST |
| Straight flight, 14 steps | Stair lift installation | $4,600 | 1 day | City, ST |
| Curved rail with a landing | Stair lift installation | $13,900 | 5 weeks | City, ST |
| Outdoor lift to the porch | Stair lift installation | $15,200 | 4 weeks | City, ST |
| Walk-in system rebuild | Walk-in closet installation | $4,900 | 4 days | City, ST |
| Walk-in framed from bedroom | Walk-in closet installation | $14,300 | 2.5 weeks | City, ST |
| Spare room dressing room | Walk-in closet installation | $33,800 | 5 weeks | City, ST |
| Cape Cod, oak to white shaker | Cabinet refacing | $12,600 | 5 days | City, ST |
| Townhouse, thermofoil | Cabinet refacing | $7,400 | 3 days | City, ST |
| Colonial, veneer plus drawers | Cabinet refacing | $21,900 | 6 days | City, ST |
| Split-level, semi-custom | Kitchen cabinet installation | $26,400 | 9 days | City, ST |
| Ranch, stock cabinets | Kitchen cabinet installation | $13,900 | 6 days | City, ST |
| Victorian, custom inset | Kitchen cabinet installation | $51,700 | 12 days | City, ST |
| L-shape, tile to quartz | Kitchen countertop installation | $5,150 | 8 days | City, ST |
| Island, waterfall quartzite | Kitchen countertop installation | $12,800 | 12 days | City, ST |
| Galley, butcher block | Kitchen countertop installation | $3,100 | 5 days | City, ST |
| Colonial, full remodel | Kitchen remodeling | $54,200 | 6 weeks | City, ST |
| Galley refresh with refacing | Kitchen remodeling | $24,800 | 3 weeks | City, ST |
| Wall removed, island added | Kitchen remodeling | $91,500 | 9 weeks | City, ST |
| Grill island on pavers | Outdoor kitchen construction | $14,300 | 2 weeks | City, ST |
| L-shaped kitchen with sink | Outdoor kitchen construction | $32,600 | 4 weeks | City, ST |
| Pavilion kitchen with oven | Outdoor kitchen construction | $78,900 | 7 weeks | City, ST |
| Dental office refresh, nights | Commercial remodeling | $68,500 | 3 weeks | City, ST |
| Cafe remodel, ADA restroom | Commercial remodeling | $142,000 | 7 weeks | City, ST |
| Retail storefront renovation | Commercial remodeling | $315,000 | 14 weeks | City, ST |
| Law office, 3,200 sq ft | Tenant improvement | $168,000 | 9 weeks | City, ST |
| Office turnover, second-gen | Tenant improvement | $28,400 | 2 weeks | City, ST |
| Dental suite from shell | Tenant improvement | $386,000 | 15 weeks | City, ST |
| Ranch, safety essentials | Aging in place remodeling | $6,400 | 4 days | City, ST |
| Cape, main-floor living | Aging in place remodeling | $36,900 | 5 weeks | City, ST |
| Two-story, bedroom suite added | Aging in place remodeling | $94,000 | 9 weeks | City, ST |
| Teardown, four-bedroom rebuild | Custom home building | $1.08M | 15 months | City, ST |
| Walkout home on a sloped lot | Custom home building | $868,000 | 14 months | City, ST |
| City lot, two-story home | Custom home building | $612,000 | 12 months | City, ST |
| Kitchen and family room redesign | Design-build services | $156,800 | 4 months | City, ST |
| Cape dormer and primary suite | Design-build services | $212,400 | 5 months | City, ST |
| Split-level interior redesign | Design-build services | $98,300 | 10 weeks | City, ST |
| Inherited house, full gut | Gut renovation | $286,500 | 8 months | City, ST |
| Condo taken to the studs | Gut renovation | $142,800 | 5 months | City, ST |
| Rowhouse gut and new layout | Gut renovation | $498,000 | 11 months | City, ST |
| Aluminum ramp, 16 feet | Wheelchair ramp construction | $4,300 | 1 day | City, ST |
| Composite switchback ramp | Wheelchair ramp construction | $13,800 | 6 days | City, ST |
| Regraded walk, no steps | Wheelchair ramp construction | $22,500 | 9 days | City, ST |
| Split-level, kitchen and 2 baths | Whole home remodeling | $168,400 | 4 months | City, ST |
| Colonial refresh, 9 rooms | Whole home remodeling | $94,700 | 9 weeks | City, ST |
| Ranch opened with new layout | Whole home remodeling | $318,000 | 7 months | City, ST |
Showing all 132 projects.
Your project next
Found one like yours? Get the same kind of estimate.
Tell us which project is closest to what you want and the supervisor prices yours on the same lines.