Custom home building · Licensed & insured · NARI member

Custom home building that prices the lot before the house,
so the budget holds.

Soil, utilities, slope and demolition can add six figures before a wall goes up. A licensed supervisor checks your lot or teardown site first, then sends a written estimate in three scopes within 24 hours. Most custom homes we build run $450,000 to $1,200,000.

Send the lot address or a photo of the house you would replace. A supervisor texts back within 5 minutes during business hours with the next step.

  • $250–$450Per sq ft, typical
  • 10–16 moTypical build time
  • 4.9410 reviews
  • 24hWritten estimate

What happens after you text us

A supervisor asks about the lot before the floor plan. The dirt sets the budget.

Most custom home budgets are broken by the site, not the house: rock, slope, a long sewer run or a well. The first exchange collects the address and any survey, then books a site walk with a supervisor before any design money is spent.

  • Site costs checked before you pay for house plans
  • Survey, soil and utilities reviewed on the first walk
  • Site walk and estimate dates set in the same thread
Text me my quote

What a custom home costs

A custom home costs $450,000 to $1,500,000. Size and site decide where you fall.

Prices cover a finished house with mid-range to upper finishes on a buildable lot, excluding land. Site work, utility hookups and demolition are priced after the site walk, so the estimate reflects your lot, not an average one.

Larger custom home

$750k–$1,200k

About 2,600 to 3,500 sq ft, more baths and upgraded finishes. Twelve to fifteen months.

  • Everything in the first tier
  • Four or five bedrooms
  • Primary suite with a spa bath
  • Finished or walkout basement
  • Upgraded windows and roofing
  • Covered porch or screened room
Price my larger custom home

Teardown and rebuild

$850k–$1.5M+

Existing house demolished, new custom home built in its place. Thirteen to sixteen months.

  • Asbestos survey and abatement
  • Utility disconnects and demolition
  • Old foundation removed
  • New foundation and utilities
  • Custom home to your plans
  • Neighbor protection plan
Price my teardown and rebuild

Price your custom home in ten seconds

Choose the scope, the size of the house and the type of site. The range updates with each pick, using the same three scopes our supervisors price after a site walk.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$450,000 to $750,000

Turn this range into a written custom home estimate

Where the money goes

The structure and systems take more than half. Finishes are what people see, not what costs most.

Averages from recent custom homes we built, excluding land. Site work and foundation vary the most from lot to lot, which is why we price the site before we price the house.

Get my itemized custom home estimate
AI concept: Excavator clearing an old house on the left, the lot with a new custom home framed on the right
A teardown adds demolition cost but removes every unknown behind the walls

Build new or renovate

Build new when the old house fights every change. Renovate when its bones are worth keeping.

A teardown costs more up front but gives you a house with no hidden history. Renovating keeps a sound foundation and frame and often costs less. At the site walk we check six things and write down which path the numbers favor.

If this is trueWe recommend
The foundation is cracked, sinking or failingBuild new
Foundation and framing are sound and squareRenovate
You need more than double the current floor areaBuild new
The layout mostly works and needs updatingRenovate
Wiring, plumbing and roof all need replacingBuild new
Zoning would not allow the same house built todayRenovate

How long it takes

A custom home takes ten to sixteen months to build, with a date on every phase.

Design and permits usually take three to six months before ground is broken. After that, the schedule runs in dated phases, and you walk the house with your supervisor at each one.

AI concept: Supervisor and owners walking a sloped building lot
AI-generated concept

Before ground breaks

Site, design, permits

Survey, soil test, utility check, plans, engineering and permits. Three to six months of preparation.

AI concept: Foundation walls poured for a new custom home
AI-generated concept

Months one to three

Site and foundation

Demolition if needed, excavation, footings, foundation walls and waterproofing, utilities brought in.

AI concept: Framed custom home with roof and windows installed
AI-generated concept

Months four to seven

Frame and dry-in

Framing, roof, windows and wrap, then wiring, plumbing and ducts inspected before insulation.

AI concept: Finished custom home with landscaping at move-in
AI-generated concept

Final months

Finish and move in

Drywall, cabinets, floors, tile, paint, exterior work and landscaping, final inspection and your keys.

What we find when we study the site

On four out of ten lots, the sewer or water connection costs more than owners expect.

Site problems are the main reason custom home budgets break. These are the six we find most often during the site walk and soil test, each priced before design so the house is drawn to a budget that already includes them.

42%

Long or deep utility connections

The sewer main is far away or too shallow for gravity. We price the run, a pump or a septic system before any house design.

27%

Soil that needs an engineered foundation

Clay, fill or high groundwater cannot carry standard footings. The soil test sets the foundation design and its cost up front.

14%

Rock or ledge under the footprint

Rock near the surface needs breaking or blasting. We probe the site early and move the house or price the removal honestly.

33%

Slope that needs retaining walls

A steep lot needs walls and drainage to hold the grade. We use the slope for a walkout level where we can, which adds useful space.

21%

Protected trees, wetlands or easements

Trees, wet areas and utility easements limit where the house can go. We map them with the survey before drawing a footprint.

36%

Asbestos in the house being torn down

Older houses often have it in siding, tile or pipe wrap. A licensed firm removes it before demolition, as required by law.

What your new house is built from

The build specification names every system, from footings to shingles.

Two custom home quotes at the same price per square foot can describe very different houses. Ours comes with a written specification of the structure, envelope and systems, so you compare the house, not the number.

AI concept: Waterproofed poured foundation with drain tile
AI-generated concept

Foundation and waterproofing

Poured concrete walls with a drainage board and footing drains, or a slab with vapor barrier, designed from the soil test report.

AI concept: New house wrapped in taped ZIP System panels
AI-generated concept

Wall and roof sheathing

Huber ZIP System panels with taped seams, which give an airtight, water-resistant shell and help pass the blower-door test.

AI concept: Black-framed windows on a new custom home
AI-generated concept

Windows and doors

Marvin, Andersen or Pella windows with low-E glass, chosen for your climate zone and the direction each wall of the house faces.

AI concept: Heat pump outdoor unit beside a new home
AI-generated concept

Heating and cooling

A variable-speed heat pump or high-efficiency furnace from Carrier, Trane or Mitsubishi, sized by Manual J for this exact house.

AI concept: Standing-seam metal roof on a custom home
AI-generated concept

Roofing

Architectural shingles from GAF or Owens Corning or a standing-seam metal roof, over synthetic underlayment and ice-and-water shield.

AI concept: Fiber cement siding and trim on a new house
AI-generated concept

Siding and trim

James Hardie fiber cement or natural wood siding with PVC trim that will not rot, painted or prefinished in the colors you choose.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Get my custom home estimate with these guarantees

Who builds your house

One supervisor from the site walk to your keys, with a named team behind them.

A custom home involves dozens of trades over more than a year. You meet the three people who coordinate them before ground is broken, and they walk the house with you at every phase.

AI-generated role illustrations. People shown are fictional, not photographs of your assigned crew.

AI concept: Fictional remodeling professional illustrating a project role
AI-generated concept

Custom home supervisor

Runs the site, the schedule, the inspections and your updates.

AI concept: Fictional remodeling professional illustrating a project role
AI-generated concept

Designer

Draws the house, renders it and guides selections with you.

AI concept: Fictional remodeling professional illustrating a project role
AI-generated concept

Site and framing lead

Oversees excavation, foundation and the framing of the house.

Illustrative project scopes

Custom home building: scope and budget examples.

Planning examples with illustrative budgets and durations. These are not completed customer jobs, invoices or promises about your project.

AI concept: Teardown, four-bedroom rebuild
AI-generated concept

Teardown, four-bedroom rebuild

Example budget
$1.08M
Example duration
15 months
Record type
Illustrative scope
AI concept: Walkout home on a sloped lot
AI-generated concept

Walkout home on a sloped lot

Example budget
$868,000
Example duration
14 months
Record type
Illustrative scope
AI concept: City lot, two-story home
AI-generated concept

City lot, two-story home

Example budget
$612,000
Example duration
12 months
Record type
Illustrative scope

Your lot is not average

Every lot and family is different. Here is how the estimate follows yours.

Each custom home starts from the same three scopes, then changes with the lot, the plans and the family who will live there. Pick the case that sounds like yours.

A teardown in your neighborhood

Many owners love the street but not the house. We handle the asbestos survey, utility disconnects, demolition permit and neighbor notices, then build a house sized to what zoning allows on the lot today.

Price a teardown and new home

A rural or wooded lot

Rural lots may need a well, a septic system, a long driveway and power brought in. We price each one after the site walk and perc test, so the house design starts from a budget that already includes them.

Price building on my rural lot

Plans you already have

If an architect has drawn the house, we price the plans line by line, point out costly details and suggest changes with the architect's agreement. If you have a stock plan, we adapt it to your lot and code.

Price the plans I already have

A home for every stage of life

A primary suite on the main floor, a zero-step entry, wide halls and blocking for grab bars cost little in a new house and a great deal to add later. We build them in from the start so the home works for decades.

Price a home built for the long run

Low energy bills

A tight shell, extra insulation, a heat pump and wiring ready for solar and an electric car charger cost less during construction than as upgrades. We model the energy use and show the payback on each choice.

Price an energy-efficient new home

A multigenerational household

Parents or adult children living with you need privacy and their own entry. We design a suite with its own bath and small kitchen, separate heating and a layout that keeps everyone close without being on top of each other.

Price a home for three generations

A firm total budget

Simple rooflines, a rectangular footprint and standard window sizes save far more than cheaper finishes. We design to your number and show which choices move the price, before you pay for detailed plans.

Price a custom home to my budget

A coastal or high-wind site

Near the coast, codes require wind-rated windows, hurricane straps and sometimes a raised foundation in flood zones. We build to the local wind and flood maps and choose materials that stand up to salt air.

Price a home for a coastal site

What this service is

Custom home building, defined the way we quote it.

Custom home building is the design and construction of a new single-family house for a specific owner on a specific lot, either vacant or cleared by demolishing an existing house. ProBuild Remodeling builds it as a licensed general contractor, handling site evaluation, design, engineering, permits and construction under one contract with one supervisor.

The service covers custom homes on vacant lots, larger homes with finished basements and upgraded finishes, and teardown projects that include abatement and demolition. It covers adapting stock or architect plans. It does not include buying land, spec homes built for sale, or renovating an existing house to the studs, which is a gut renovation with its own page.

It is for families who own or are buying a lot, owners of a worn-out house on a lot they love, and households planning a home for several generations. It is not for buyers who want a move-in-ready house within a few months, or for projects where renovating a sound house would give the same result for less.

Custom home terms you will see in your estimate

Teardown
An existing house demolished so a new one can be built on the lot. Includes abatement, disconnects and permits.
Perc test
A soil test showing how fast water drains. It decides whether and what type of septic system a rural lot can have.
Site work
Clearing, excavation, grading, driveways and utility trenches. The most variable cost from one lot to the next.
Build specification
The written list of materials and systems in the house, attached to the contract so every quote can be compared.
Allowance
A budget line for finishes not yet chosen, like lighting. Kept realistic and replaced by real prices once you pick.
Manual J
The industry calculation of the heating and cooling a specific house needs, so the system is not oversized.
Blower-door test
A test that measures how airtight the new house is. Tight houses cost less to heat and cool.
Certificate of occupancy
The document the building department issues after final inspection. You can move in legally once it is granted.

Questions we hear on every custom home call

The eight questions people ask before building a custom home.

How much does it cost to build a custom home?

Most custom homes we build run $250 to $450 per square foot excluding land, or about $450,000 to $1,200,000 for 2,000 to 3,500 square feet. Teardowns add demolition and abatement. Site work and finishes move the final number most.

Is it cheaper to tear down and rebuild or to renovate?

Renovating is usually cheaper when the foundation and frame are sound and the layout mostly works. Tearing down makes sense when the foundation is failing, every system needs replacing, or you need far more space than the house has.

How long does it take to build a custom home?

Construction takes 10 to 16 months for most homes, after three to six months of site study, design and permits. Teardowns add a few weeks for abatement and demolition. Your contract carries a date for each phase.

Do I need an architect to build a custom home?

Not always. Our designers can draw the house, or we can adapt a stock plan to your lot. If you prefer an architect, we work with yours and price the drawings as they develop, so the design stays within budget.

What is not included in the price of a custom home?

Land is never included. Site work, utilities and demolition are priced separately after the site walk, and any allowance is listed with its amount. Furniture, window coverings and landscaping beyond grading are extras unless you add them.

Can you build on a lot I have not bought yet?

Yes, and it is the best time to call. A site walk before closing can reveal rock, slope, utility distance or easements that change the cost, so you can negotiate or walk away with real numbers.

How do payments work on a custom home build?

Payments follow completed phases, such as foundation, framing and dry-in, and many owners use a construction loan that pays the same way. We provide the documents lenders ask for at each draw.

Can we visit the site during construction?

Yes. You walk the house with your supervisor at each phase, and you can visit other times by arranging it ahead so the site is safe. You also get weekly photo updates between visits.

Custom home building near you

Your remodeling address, within our service area.

Zoning, soil and energy codes differ from county to county. Each custom home is built by a local supervisor and crew under the license of the state where the lot is.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free custom home estimate

Send your answers now. Get your lot reviewed and three scopes priced.

Your custom home supervisor reads the answers, texts back within 5 minutes during business hours and books the site walk in the same conversation.

Text my quote Call now

Images marked as AI concepts illustrate remodeling ideas, materials and conditions. People shown are fictional role illustrations, not actual ProBuild employees. Images are not photographs of completed ProBuild projects or verified before-and-after pairs.

Your remodeling question

Discuss Custom home building

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.