Gut renovations · Licensed & insured · EPA lead-safe certified

A gut renovation that replaces what is behind the walls,
not only what is on them.

A licensed supervisor inspects the wiring, pipes, framing and insulation before pricing anything, then sends three written scopes within 24 hours. Gutting a condo or small house starts near $110,000; a full house to the studs usually runs $200,000 to $400,000, with new systems throughout.

Text a few photos of the rooms and the electrical panel. A supervisor gets back to you in under 5 minutes on business days.

  • $100–$250Per sq ft, typical
  • 6–9 moFull-house gut
  • 4.9410 reviews
  • 24hWritten estimate

What happens after you text us

A supervisor asks to see the panel and the pipes. The finishes come later.

A gut renovation is priced from what is inside the walls. The first exchange asks for photos of the electrical panel, the water heater and any stains, then books an inspection visit and a date for your written scopes.

  • Systems inspected before any number is written
  • Photos of the panel and pipes cut the guesswork in half
  • Inspection and estimate dates agreed in the same thread
Text me my quote

What a gut renovation costs

A gut renovation costs $110,000 to $700,000. The systems behind the walls drive the price.

Prices cover demolition to the studs, new wiring, plumbing, insulation and drywall, and mid-range finishes. Structural repairs and abatement are priced after testing. A layout change adds engineering and more framing on top.

Unit or floor gut

$110k–$200k

A condo, apartment or one floor taken to the studs and rebuilt. Four to six months.

  • Demolition to the studs
  • New wiring and panel feed
  • New supply and drain lines
  • Insulation and new drywall
  • Kitchen and one or two baths
  • Floors, doors, trim and paint
Price my unit or floor gut

Gut and rebuild

$400k–$700k+

Studs out where the plan changes, structure repaired, new layout. Nine to twelve months.

  • Everything in Full-house gut
  • Walls moved with engineered beams
  • Subfloor and joist repairs
  • Windows and exterior doors
  • Kitchen and baths relocated
  • Architectural and engineering plans
Price my gut and rebuild

Price your gut renovation in ten seconds

Pick the scope, the floor area and the age of the house. The range responds to each choice, based on the same three scopes our supervisors price after inspection.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$200,000 to $400,000

Turn this range into a written gut renovation estimate

Where the money goes

A quarter of the budget goes into the walls. You pay for it once and never see it again.

Averages from recent full-house guts. Wiring, plumbing, ducts and insulation are what separate a gut from a remodel, and they are the lines a cheap quote leaves vague. Finishes are a smaller share than most people expect.

Get my itemized gut renovation estimate
AI concept: Room stripped to the studs with new wiring on the left, room with new finishes over existing walls on the right
A gut replaces what is behind the walls; a remodel replaces what is on them

Gut it or remodel it

Gut the house when the systems are failing. Remodel it when only the surfaces are.

Taking walls to the studs costs more up front but is the only way to replace wiring, pipes and insulation properly. If the systems are sound, a remodel is faster and cheaper. At the inspection we check six things and put the answer in writing.

If this is trueWe recommend
The panel has fuses or the wiring is ungroundedGut
Wiring and panel were updated in the recent pastRemodel
Supply pipes are galvanized steel or leakingGut
Walls are sound and you like most of the layoutRemodel
Water, fire or mold damage reached inside wallsGut
You need to stay in the house during the workRemodel

How long it takes

A full-house gut takes six to nine months, and the walls stay open until every inspection passes.

A condo or single floor takes 4 to 6 months, a gut with a new layout 9 to 12. The house is empty during the work, which is why it moves faster per room than a remodel you live through.

AI concept: Supervisor inspecting an old fuse panel
AI-generated concept

Before day one

Inspect, test, permit

Systems inspected, lead and asbestos tested, plans drawn, permits filed. Six to ten weeks.

AI concept: Room stripped to bare studs after demolition
AI-generated concept

Weeks one to four

Abatement and demo

Licensed abatement if needed, then plaster, drywall and fixtures removed down to the framing.

AI concept: New wiring and PEX lines run through open studs
AI-generated concept

Months two and three

Systems and framing

Repairs to joists and studs, new wiring, pipes and ducts, rough inspections, then insulation.

AI concept: Finished living room after a full gut renovation
AI-generated concept

Final months

Close up and finish

Drywall, kitchen, baths, floors, trim and paint, then final inspections and your walkthrough.

What we find once the walls are down

Seven in ten houses we gut have framing damage somewhere that needs repair.

The upside of a gut is that nothing stays hidden. These are the six problems we find most often once the walls are open. Each is photographed, priced and approved by you before it is fixed.

71%

Rotted or cut joists and studs

Old leaks and past plumbers leave damage. We sister, replace or reinforce each member so the floor is flat and the walls are straight.

46%

Knob-and-tube or cloth wiring still live

Old circuits hidden behind newer ones. We remove every run back to the panel, so nothing old stays connected inside a new wall.

53%

Cast-iron drain lines cracked or scaled

Cast iron narrows and cracks with age. We replace it with PVC down to the main, while it is reachable, instead of after a backup.

62%

Walls and attic with no insulation

Many older homes have little or none. We insulate every exterior wall and the attic to current code, which you feel in the first winter.

24%

Asbestos in floor tile or pipe wrap

Common in older flooring and insulation. A licensed abatement firm removes it with air testing before any demolition starts.

17%

Termite or carpenter ant damage

Sills and studs near the ground get eaten first. We treat, replace the damaged wood and install barriers before rebuilding.

What goes inside your walls

Every system behind the walls is named in writing, because it will not be seen again for decades.

Two gut quotes can have the same finishes and very different houses behind them. Ours names the wire, the pipe, the insulation and the panel, so you know what you are living inside.

AI concept: New 200-amp electrical panel with labeled breakers
AI-generated concept

Electrical panel and wiring

A new 200-amp panel from Square D or Siemens, copper wiring on dedicated circuits, and arc-fault and GFCI protection by code.

AI concept: PEX manifold with individual shutoff valves
AI-generated concept

PEX water lines

Uponor or Viega PEX supply lines with a manifold and shutoffs per fixture, so a leak can be isolated without shutting off the house.

AI concept: A simple white PVC drain elbow and straight pipe sections arranged separately on a clean wooden workbench
AI-generated concept

PVC drain and vent lines

Schedule 40 PVC drains and vents replacing old cast iron and galvanized, sloped and tested before a single wall is closed up.

AI concept: Insulation batts installed between open wall studs
AI-generated concept

Wall and attic insulation

Rockwool or fiberglass batts, or closed-cell spray foam at rim joists, to current energy code, cutting drafts and heating bills.

AI concept: Mold-resistant drywall hung in a bathroom
AI-generated concept

Drywall and moisture board

Standard drywall in dry rooms, mold-resistant board in baths and laundry, and cement board or foam board behind every shower.

AI concept: New ductwork run through open ceiling joists
AI-generated concept

Heating and cooling

A heat pump or high-efficiency furnace from Carrier or Lennox, with new ducts sized room by room while ceilings are open.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Get my gut renovation estimate with these guarantees

Who works in your house

A supervisor and two trade leads, from the first wall down to the last coat of paint.

A gut renovation is mostly systems work. You meet the supervisor and the leads for electrical and plumbing before demolition, and they sign off on every rough inspection with the city.

AI-generated role illustrations. People shown are fictional, not photographs of your assigned crew.

AI concept: Fictional remodeling professional illustrating a project role
AI-generated concept

Gut renovation supervisor

Runs demolition, sequencing, inspections and your weekly report.

AI concept: Fictional remodeling professional illustrating a project role
AI-generated concept

Lead electrician

Removes old circuits, installs the new panel and every new run.

AI concept: Fictional remodeling professional illustrating a project role
AI-generated concept

Lead plumber

Replaces supply and drain lines from the main to every fixture.

Illustrative project scopes

Gut renovation: scope and budget examples.

Planning examples with illustrative budgets and durations. These are not completed customer jobs, invoices or promises about your project.

AI concept: Inherited house, full gut
AI-generated concept

Inherited house, full gut

Example budget
$286,500
Example duration
8 months
Record type
Illustrative scope
AI concept: Condo taken to the studs
AI-generated concept

Condo taken to the studs

Example budget
$142,800
Example duration
5 months
Record type
Illustrative scope
AI concept: Rowhouse gut and new layout
AI-generated concept

Rowhouse gut and new layout

Example budget
$498,000
Example duration
11 months
Record type
Illustrative scope

Your house is not average

Every house hides something different. Here is how your case changes the scope.

Every gut starts from the same three scopes, then moves for the building, the damage and your timeline. Pick the case that sounds like yours.

A very old house

Balloon framing, plaster on lath, fuses and cast iron are normal in older homes. We plan the gut around them, name the fire blocking code requires and test for lead and asbestos before any demolition is scheduled.

Plan a gut for my older house

Water or flood damage

Once water reaches inside the walls, drying is rarely enough. We remove wet materials, measure moisture in the framing, treat for mold and rebuild only when readings are dry, with photos for your insurance file.

Plan a gut after water damage

An insurance claim

After a fire or flood we document the damage, write the scope in the line-item format adjusters use and meet them on site. You decide which upgrades to pay for beyond what the policy covers, line by line.

Get help scoping my insurance gut

A condo or apartment

Condo guts need board approval, insurance certificates, freight elevator bookings and quiet hours. We handle the paperwork with management and coordinate risers and shared walls with the building engineer.

Price my condo gut renovation

A house you just bought

Gutting before you move in avoids living in a dust zone and lets the crew work much faster. We plan the scope during your closing period, so demolition can start the same week you get the keys to the house.

Plan a gut before we move in

A historic district

Historic commissions often protect windows, trim and facades even when the inside is fully gutted. We document what must stay, restore it where required and file the approvals before any exterior work starts.

Plan a gut in a historic district

Cutting energy bills

Open walls are the best chance to air-seal and insulate the whole house. We add insulation to code, seal the attic floor and size a heat pump for the tighter house, which often lets it be smaller and cheaper.

Plan an energy-efficient gut

Keeping costs in check

Keeping the kitchen and baths where they are saves the most, because drains and vents stay put. We show which walls can move cheaply and which ones carry pipes, beams or ducts that make every change expensive.

Price a gut on a tighter budget

What this service is

A gut renovation, defined the way we quote it.

Gut renovation is the removal of all interior finishes of a house or unit down to the structural framing, followed by replacing the electrical, plumbing, heating and insulation and rebuilding every room. ProBuild Remodeling performs it as a licensed general contractor, with testing, abatement, permits and inspections under one contract and one supervisor.

The service covers condo, apartment and single-floor guts, full-house guts that keep the layout, and guts that also move walls and relocate the kitchen or baths. It includes framing repairs found once walls are open. Remodeling rooms while keeping walls and systems is whole home remodeling, and building a new house after demolition is custom home building, each with its own page.

It is for owners of older, inherited or damaged houses whose wiring, plumbing or insulation has failed, and buyers who can keep the house empty during the work. It is not for houses with sound systems and good walls, where a remodel costs far less, or for families who must live in the house throughout.

Terms on a gut renovation estimate, explained

To the studs
All drywall, plaster, flooring and fixtures removed so only the framing is left. Every pipe and wire becomes visible.
Abatement
Safe removal of asbestos or lead paint by a licensed firm, with sealed areas and air testing before work continues.
Rough inspection
The city's check of new wiring, plumbing and framing before insulation and drywall cover them. Required by permit.
Repipe
Replacing every supply line in the house, usually with PEX or copper, so old corroded pipes are fully retired.
Knob and tube
An early wiring method with no ground wire, run on ceramic knobs. Insurers often refuse to cover houses that still have it.
Sistering
Fastening a new joist or stud alongside a damaged one so the pair carries the load again without tearing out the old one.
Fire blocking
Wood or sealant placed in wall cavities to slow fire from spreading between floors. Code requires it once walls are open.
Air sealing
Closing gaps at the attic floor, rim joists and penetrations so heated air stays inside. Easiest when walls are open.

Questions we hear on every gut renovation call

The eight questions people ask before gutting a house.

How much does a gut renovation cost?

Most full-house guts run $100 to $250 per square foot, or about $200,000 to $400,000 for a typical house. A condo or single floor starts near $110,000. Layout changes, structural repairs and abatement push projects to the top of the range.

What does a gut renovation include?

Demolition to the framing, repairs to any damaged studs or joists, new wiring, new supply and drain lines, new ducts or HVAC, insulation, drywall and every finish from floors to fixtures. Testing and permits are included in our scope.

How long does a gut renovation take?

A condo or single floor takes 4 to 6 months, a full house 6 to 9 months and a gut with a new layout 9 to 12. Inspection, testing, design and permits take six to ten weeks before demolition starts.

Can I live in the house during a gut renovation?

No. With walls open, water and power shut off in sections and dust everywhere, the house is not safe to live in. Most owners plan six to twelve months elsewhere, or gut the house before moving in.

Is it cheaper to gut a house or tear it down and rebuild?

Gutting is usually cheaper when the foundation and framing are sound, because they are the costliest parts to replace. When the foundation is failing or the house is far too small, a teardown and new build can make more sense.

Do I need a permit to gut a house?

Yes. Demolition, electrical, plumbing and mechanical work each need permits, and the city inspects the rough work before walls are closed. We pull every permit under our license and schedule each inspection.

What happens if you find asbestos or lead paint?

We test before demolition. If either is present, a licensed abatement firm removes it with sealed areas and air testing, priced as its own line. Lead-safe EPA RRP practices apply to any painted surface we disturb.

Will a gut renovation lower my energy bills?

In most older houses, yes. Insulating every exterior wall, sealing the attic and replacing old HVAC typically cuts heating and cooling costs noticeably, and the house feels less drafty in the first winter.

Gut renovations near you

Your remodeling address, within our service area.

Abatement rules and inspection steps differ by city. Each gut renovation is run by a local crew with trade leads licensed in the state where the house stands.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free gut renovation estimate

Send your answers today. Get your house inspected and three scopes in writing.

Your gut renovation supervisor reads the answers, texts back within 5 minutes during business hours and books the inspection visit in the same conversation.

Text my quote Call now

Images marked as AI concepts illustrate remodeling ideas, materials and conditions. People shown are fictional role illustrations, not actual ProBuild employees. Images are not photographs of completed ProBuild projects or verified before-and-after pairs.

Your remodeling question

Discuss Gut renovation

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.