A per-foot price that keeps growing
A low number per square foot often leaves out removal, leveling, trim and transitions. Our estimate is a project total with each of those written in, so the price you sign is the price you pay.
Flooring services · Licensed & insured
Vinyl plank, laminate and carpet, new solid or engineered hardwood, sanding and refinishing the wood you already have, and porcelain or stone tile. Each service below shows a price range and timeline with removal and subfloor prep inside it, so the number does not grow once the old floor is up.
Send a picture of today's floor and, if you can, one of a floor vent with the cover off. A flooring supervisor tells you within 5 minutes on business days which service fits.
Why flooring projects go wrong
Gapping planks, cracked tile and cupped hardwood are almost never the product's fault. They come from a subfloor that was not flat, stiff or dry, and from a quote that never priced fixing it.
A low number per square foot often leaves out removal, leveling, trim and transitions. Our estimate is a project total with each of those written in, so the price you sign is the price you pay.
A damp slab or crawlspace cups hardwood and lifts planks. We meter the subfloor before choosing a material, and add a vapor barrier or pick a waterproof floor when it reads high.
Many houses hide oak under carpet that only needs refinishing, for a third of new hardwood. We check what is underneath and tell you in writing before anything is ordered.
Flooring services we install
Go to the floor type you are leaning toward. Each page compares three tiers, lists what is inside each one, shows the install schedule and names what usually turns up under old flooring.
Vinyl plank, laminate, engineered wood or carpet in one room or the whole floor, with the subfloor made flat first.
Solid or engineered hardwood in oak, hickory or maple, acclimated on site and nailed, glued or floated to suit your subfloor.
Sand to bare wood, change the stain and lay new coats of Bona water-based finish, with dust contained by a vacuum system.
Porcelain, ceramic or natural stone floors set over a Schluter DITRA membrane, with heated floor and grout options priced.
Not sure which one you need
You probably know the look you want more than the trade name. Pick the line closest to your floor today; at the measure we confirm it or tell you honestly if another floor suits the room better.
Ask a supervisor which floor fits| If you want to | Start with |
|---|---|
| Get a waterproof, pet-proof floor through the main level | Flooring installation |
| Replace carpet in bedrooms and on the stairs | Flooring installation |
| Put real oak or hickory where there is carpet now | Hardwood floor installation |
| Bring scratched, gray or orange wood floors back | Hardwood floor refinishing |
| Change the color of the hardwood you already have | Hardwood floor refinishing |
| Tile a bathroom, kitchen or entry, with heat if you want | Tile flooring installation |
Flooring costs at a glance
Each range goes from a single room to most of a house and already includes tear-out, subfloor prep and trim. The estimate breaks out those same items, so a per-foot bid from someone else is easy to check.
| Service | Typical range | Typical time |
|---|---|---|
| Flooring installation | $2k–$38k | 1 day to 2 weeks |
| Hardwood floor installation | $3.5k–$50k | 2 days to 3 weeks |
| Hardwood floor refinishing | $800–$16k | 1 to 7 days |
| Tile flooring installation | $1.5k–$26k | 2 days to 2 weeks |
Figures are typical totals for material, labor, removal, prep and hauling; your fixed price replaces them once the floors are measured.
Floors before and after




How a flooring project runs
Every flooring service runs on the same four steps, from a single-day recoat to a two-week whole-house install.
Step 01
On-site visit, scope review, honest repair-or-replace opinion. No pressure, no decision needed that day.
Step 02
Itemized quote with Good, Better and Best options, a declared contingency and a dated schedule.
Step 03
We pull permits, schedule inspections and send you a room-by-room prep checklist.
Step 04
Daily updates, clean site every evening, final walkthrough and a written warranty in your hand.
Written into every contract
The approved price is the final price. Change orders only with your written approval.
A credit for every working day of delay we cause. Weather and inspections excepted, in writing.
Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.
A text or email every working day with photos and tomorrow's plan, or the day is free.
Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.
A small deposit, then you pay only for work that is already completed, inspected and photographed.
Other flooring work we quote
Our flooring crews handle these on the same visit, each one priced as its own line, so thresholds, stair parts and repairs match the new floor.
Flooring questions
Refinish if the boards have enough wood above the tongue and are not cupped or stained through; it costs about a third of new hardwood. Replace if nail heads or tongues show, or large areas are water damaged. We check a floor vent and the worst spot before recommending either.
Vinyl plank is waterproof, quieter with a pad and handles pets and basements better, at roughly half the installed cost. Hardwood is real wood, can be refinished for decades and usually adds more resale value. Many homes use hardwood in living areas and vinyl plank in kitchens and basements.
Porcelain tile and rigid-core vinyl plank both handle spills and dropped pans well. Tile lasts longest and suits radiant heat; vinyl plank is warmer, softer underfoot and faster to install. Engineered hardwood works if you wipe spills quickly.
A hardwood screen and recoat takes one day. One room of vinyl plank, laminate or carpet takes one to two days. A full refinish takes three to five days, a main floor of tile about the same, and a whole-house hardwood install two to three weeks.
Usually. We plan heights during the estimate, build up or grind the subfloor where needed and use flush transition strips, so tile, wood and vinyl can meet with little or no lip, which matters for anyone with a walker or a robot vacuum.
Rarely. Plank, carpet and tile go in room by room, and we keep a path open. For a full refinish, plan to stay off the sanded rooms for about a day per coat, and with oil-based finish many families spend a night elsewhere.
Flooring crews near you
Floors are laid, sanded and tiled by flooring crews based near you, working under the contractor license for your state, which is listed below.
Free flooring estimate
Choose the floor service and tell us what you have underfoot now. Within 5 minutes on business days, a flooring supervisor texts to book the measure.