Modular aluminum
$2.5k–$8k
- EZ-ACCESS or similar sections
- Rails on both sides
- Top and bottom landings
- Slip-resistant surface
- No footings or concrete
- Removal credit if not needed
Wheelchair ramp construction · Licensed & insured · Permit handled
A home ramp needs one foot of length for every inch of rise, a landing at each turn and rails on both sides. A licensed supervisor measures the steps, checks the yard and sends three written prices within 24 hours. Modular ramps go in within two days; built ramps in about a week.
Text a photo of the steps with a tape measure against the top one. We tell you the ramp length before we visit.
What happens after you text us
Most ramp requests arrive just before someone comes home from a hospital. You send a photo of the steps with a tape measure, we work out the length and layout, and you get a visit time the same day.
Hi, my mother is coming home from rehab next Friday in a wheelchair. Her house has four steps up to the front door and no way to get her in.
Hi Kevin, I am Jason, I build our ramps. We can make Friday. Could you send a photo of the steps with a tape measure standing against the top one, and one of the yard in front?
Sent. It measures 26 inches to the top.
Thanks. 26 inches means about 26 feet of ramp with a landing halfway, so it will need to turn along the house. I would put in an aluminum ramp now, and we can talk about a permanent one later. Thursday at 9 to measure?
Thursday works. Can it really be in before Friday?
Yes. Modular sections are in stock. I will send the price Thursday afternoon and install Wednesday or Thursday of next week, before she is home.
What a wheelchair ramp costs
For a typical entry 18 to 30 inches high, most homeowners choose a built wood or composite ramp. Aluminum is faster and can be removed; concrete lasts longest. Your written estimate shows all three for your steps.
Modular aluminum
$2.5k–$8k
Built wood or composite
$8k–$18k
Concrete or zero-step
$18k–$35k
Choose the tier, the height of the entry and what the house is like. The range changes as you choose, from the same numbers our ramp supervisors quote.
A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.
Typical range for your answers
Turn this range into a written ramp estimateWhere the money goes
Averages from our recent built wood and composite ramps. Framing and decking scale with length, while the rails and landings are what make a ramp safe to use rather than just a slope.
Get my itemized ramp estimate
Ramp or platform lift
Above about 30 inches of rise, a ramp becomes 30 feet or longer with several landings, and pushing up it gets tiring. A vertical platform lift fits in a much smaller spot. We check six things and write down which answer suits the entry.
| If this is true | We recommend |
|---|---|
| The top step is under 30 inches above the ground | Build a ramp |
| The rise is over 36 inches, a full porch or deck | Consider a lift |
| There is 20 to 30 feet of yard along the house | Build a ramp |
| The lot is narrow or slopes steeply to the street | Consider a lift |
| The user pushes a manual chair without help | Build a ramp |
| A power outage must not trap anyone inside | Build a ramp |
How long it takes
Modular aluminum ramps install in one to two days from stock. Built wood or composite ramps take four to seven days including footings and inspection. Concrete takes one to two weeks because it must cure.

Day one
We measure the rise, mark the route along the house and send three written prices with a drawing.

Days two to three
Permit filed where required, utilities marked, footing holes dug and poured below the frost line.

Days four to six
Framing set to a 1:12 slope, landings leveled, decking laid and rails fixed on both sides.

Final day
The user rolls or walks the ramp with us, we adjust the threshold and hand over the warranty.
Before and after






What the ramp is made of
Each ramp material has a different price, lifespan and look. The estimate names the product and finish so you can weigh speed, cost and upkeep for this house and this person.

EZ-ACCESS and American Ramp Systems sections bolted together with rails. Installs in a day, never rots and can be removed or resold later.

Ground-contact lumber on concrete footings. The lowest cost built ramp, painted or stained to match; needs sealing every two to three years.

Trex and TimberTech boards on treated framing. Looks like wood, does not splinter or rot, and needs only an occasional wash to stay grippy.

Reinforced concrete with a broom finish for grip. The most permanent ramp, nearly maintenance free, best where the rise is modest.

Continuous rails 34 to 38 inches high on both sides, round enough to grip, in painted wood, aluminum or powder-coated steel.

Curbs or low rails along each edge so a wheel cannot slip off the side. Required on every ramp we build, whatever the material.
Written into every contract
The approved price is the final price. Change orders only with your written approval.
A credit for every working day of delay we cause. Weather and inspections excepted, in writing.
Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.
A text or email every working day with photos and tomorrow's plan, or the day is free.
Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.
A small deposit, then you pay only for work that is already completed, inspected and photographed.
Who builds the ramp
Ramps are usually built while someone waits to come home, so the crew is small and the schedule tight. Every person is background-checked and introduced by name, and the same crew finishes what it starts.

Measures the rise, draws the route and checks every slope.

Sets footings, frames landings and fixes the handrails.

Lays decking, installs edge curbs and cleans up daily.
Recent ramps, with real numbers



Your entry is not average
Every ramp starts from the same three tiers, then changes for the height, the yard and the person using it. Find the case that sounds like your house.
When a discharge date is set, an aluminum ramp from stock is the fastest safe answer, often installed within two days. If you want a permanent ramp later, part of the aluminum cost is credited when we take it back.
Get a ramp in before the dischargeAfter surgery or an injury, a ramp may only be needed for a season. Modular aluminum can be installed, used for the recovery and removed without a trace, with part of the price credited back when it goes.
Price a ramp for a short recoveryOn a porch with turned posts and painted trim, a ramp should look like it was always there. We build it in wood with matching rails and paint, and route it along the side so the front of the house keeps its face.
Price a ramp that matches my porchA ramp is only useful if it is safe in January. We choose grippy decking or broom-finished concrete, add a roof or awning over the top landing where possible, and slope the surface slightly so water never pools.
Price a ramp built for winterPower chairs are heavier and longer than manual ones. We widen the ramp to 42 inches or more, size landings for the turn and make sure the framing carries the full weight of the chair and its rider together.
Price a ramp for a power chairSome associations and cities review ramps before they go up. We draw the plan, handle the permit and HOA forms, and pick materials and colors that are most likely to be approved by the board on the first try.
Price a ramp with HOA approvalWhen a straight run does not fit, a switchback ramp folds back on itself with a landing at each turn. It uses more landings but less yard, and still keeps a gentle 1:12 slope all the way from bottom to top.
Price a switchback ramp for my yardFor one or two steps, a short aluminum ramp or a threshold ramp may be all you need. We tell you honestly when a smaller ramp is safe and when saving money would mean a slope far too steep to push up alone.
Price the simplest ramp that worksWhat this service is
Wheelchair ramp construction is the building of a sloped path with level landings, handrails and edge protection that lets a person in a wheelchair, scooter or walker reach a home's entry without steps. ProBuild Remodeling builds residential ramps in aluminum, wood, composite and concrete as a licensed contractor, using a 1:12 slope, one inch of rise for every twelve inches of length.
The service covers measuring and drawing the route, permits, footings, framing or concrete, decking, landings, handrails on both sides, edge curbs and lowering the door threshold. It follows ADA guidelines as a reference for slope, width and rail height. It does not include vertical platform lifts or stair lifts, which have their own pages, or ramps inside commercial buildings.
It is for families bringing someone home in a wheelchair, people using a walker who find steps risky, and homeowners planning to stay in the house long term. It is not the right answer for very high entries where a ramp would run 40 feet or more; there we will tell you a lift makes more sense.
Questions about wheelchair ramps
A modular aluminum ramp runs $2,500 to $8,000 depending on length. A built wood or composite ramp with landings runs $8,000 to $18,000. A poured concrete ramp or a regraded zero-step walk runs $18,000 to $35,000.
At a 1:12 slope, one foot of ramp for every inch of rise. A 24-inch porch needs about 24 feet of ramp plus landings at the top, bottom and any turn. We measure the rise at the visit and draw the route before pricing it.
We build to 1:12, one inch of rise per foot of run, which is the ADA guideline and what most people can push without help. A gentler 1:16 or 1:20 slope is easier still and worth it when the yard has room.
Most cities require a permit for a permanent ramp attached to the house, and some require one for any ramp over a certain height. Modular aluminum ramps are often exempt. We check the local rule and file the permit under our license.
A modular aluminum ramp can usually be installed within two days of the measuring visit, since sections are kept in stock. Built wood and concrete ramps take longer, so we often install aluminum first and build the permanent ramp later.
At least 36 inches between the handrails for a manual chair or a walker. For a power chair or scooter we build 42 to 48 inches, and landings at turns need a 5 by 5 foot flat area so the chair can turn.
Aluminum is fastest and removable, wood is the lowest cost built ramp but needs upkeep, composite looks like wood without the upkeep, and concrete lasts the longest. The best one depends on how long it is needed and how the house looks.
Modular aluminum ramps come out in a day and can be credited back or resold. Wood and composite ramps can be taken down, and we restore the steps and lawn. Concrete ramps are permanent and are usually kept as a sloped walk.
Wheelchair ramp construction near you
Ramps are built by local carpentry crews licensed in the state the house is in, who know the local permit rules and how deep footings must go for that climate.
Free ramp estimate
A ramp supervisor reads your answers, texts back within 5 minutes on business days and sets a measuring visit, sooner if a hospital discharge date is close.