Framing · Licensed & insured · Permits pulled

Framing that passes inspection
the first time the inspector walks in.

New walls, wider doorways, a load-bearing wall replaced by a beam, or a basement framed for finishing. A licensed framing lead checks what the wall carries, brings in an engineer when the beam needs one, and pulls the permit. You get a written price within 24 hours of the visit.

Send a photo of the wall and tell us what is above it. A framing lead replies within 5 minutes during business hours.

  • $8k–$22kBearing wall removal
  • 2–5 daysMost wall jobs
  • 4.9410 reviews
  • 24hWritten estimate

What happens after you text us

A framing lead asks what the wall carries, before anyone talks price.

Whether a wall holds up the house decides the whole job. The framing lead asks for photos of the wall and the space above it, tells you what he sees, and books a visit to confirm it with a look in the attic or basement.

  • A licensed framer, not a salesperson, reads your photos
  • Photos of the attic or basement tell us where the joists run
  • You learn early if an engineer or a permit is needed
Text me my quote

What framing costs

Framing jobs run $2,000 to $45,000. What the wall carries decides the tier.

Most remodel framing is either a non-bearing wall or a bearing wall with a new beam. The estimate shows engineering, permit and patching as separate lines, so you see what the structure costs apart from the finish work.

Wall or opening

$2k–$7k

A new partition wall or a wider opening in a non-bearing wall. One to three days of framing.

  • Wood stud wall to code
  • Header over new openings
  • Blocking for cabinets or TV
  • Outlets moved by electrician
  • Drywall patched and taped
  • Permit where required
Get my wall framing estimate

Basement or floor

$15k–$45k+

A whole basement or floor framed for finishing, or major framing repair. One to three weeks.

  • Pressure-treated bottom plates
  • Walls held off foundation
  • Soffits around ducts and pipes
  • Egress window opening framed
  • Fire blocking to code
  • Ready for rough-in inspection
Get my basement framing estimate

Estimate your framing job

Choose the type of framing, how big the area is and what kind of house it sits in. The range changes with every choice, from the same numbers our framing leads use on site.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$8,000 to $22,000

Turn this range into a written framing estimate

Where the money goes

On a wall removal, structure is half the bill. Patching up afterward is the other half.

Averages from our recent load-bearing wall removals. The beam itself is rarely the big number; shoring, engineering and restoring the ceiling, floor and drywall around it are what separate a real quote from a lowball one.

Get my itemized framing estimate
AI concept: Open ceiling showing joists resting on top of a wall, next to joists running parallel to a wall
Joists resting on the wall mean it carries load; joists running beside it usually mean it does not

Can this wall come out

Most walls can come out. The question is whether yours needs a beam.

A non-bearing wall only holds itself up and comes out in a day or two. A bearing wall carries a floor or roof and needs a beam and posts to take over the load. These six signs tell us which one you have before anyone opens it.

If this is trueYour wall
Floor or ceiling joists rest on top of it at a right angleNeeds a beam
Joists run parallel to it and do not touch itSimple removal
There is a beam or wall directly below it in the basementNeeds a beam
It was added later to divide a roomSimple removal
It sits near the middle of the house and runs its lengthNeeds a beam
It is a closet wall under a roof with trussesSimple removal

How long it takes

A bearing wall comes out in about a week, with the inspection inside that week.

A new partition wall takes one to three days. Basement framing takes one to three weeks depending on size. The permit and engineering happen before the first day in your house.

AI concept: Engineer measuring a joist span in an open ceiling
AI-generated concept

Before day one

Engineer and permit

The engineer sizes the beam and posts, we file the permit and order the beam to your length.

AI concept: Temporary shoring walls holding a ceiling
AI-generated concept

Day one

Protect and shore

Floors are covered, dust walls go up and temporary walls hold the ceiling before anything comes out.

AI concept: New LVL beam being lifted into place
AI-generated concept

Days two and three

Remove and set beam

The old wall comes out, the beam and posts go in, and loads are transferred down to solid bearing.

AI concept: Inspector checking a new beam and posts
AI-generated concept

End of the week

Inspect and close

The framing inspector signs off, then drywall, patching and paint prep can begin.

What we find once the wall is open

In a third of the walls we open, something is running through it that has to move.

These six conditions show up most often when we open walls for framing. Each is photographed and priced on its own, and nothing is changed without your written approval.

33%

Ducts, pipes or wires inside the wall

Heating ducts and drains cannot just be cut. We reroute them with licensed trades so the room still heats and the sink still drains.

21%

Framing notched or cut by past work

Old plumbers and electricians sometimes cut joists or studs. We sister new lumber alongside so the structure carries its full load again.

16%

Posts that land on nothing solid

A new beam needs a footing under each post. We add or enlarge footings in the basement or crawl space so nothing settles.

12%

Rot or termite damage

Usually near old leaks or at the sill. We cut out damaged wood, treat the area and replace it before new framing ties in.

26%

Floors on each side at different heights

When a wall comes out, the floors meet. We level the joint before new flooring so there is no ridge where the wall stood.

9%

Knob-and-tube or ungrounded wiring

Common in older homes. Any old wiring in the wall is replaced back to a safe point by a licensed electrician and inspected.

What the framing is made of

Every beam and stud is named by size and grade, so you know what holds up the house.

A framing quote that just says "install beam" leaves out the part that matters. Ours names the beam material, its size and the posts and hardware under it, taken from the engineer's letter.

AI concept: Engineered LVL beam stacked on a jobsite
AI-generated concept

LVL beams

Laminated veneer lumber from brands like Weyerhaeuser Microllam. Stronger and straighter than sawn lumber, so it spans farther.

AI concept: Steel I-beam set on posts in a basement
AI-generated concept

Steel beams

Used for the longest spans or where the beam must stay shallow. Needs more crew and equipment, and often costs more.

AI concept: Kiln-dried studs framing a new wall
AI-generated concept

Kiln-dried studs

Straight 2x4 and 2x6 studs, kiln-dried so they do not twist or shrink after drywall goes on and crack the taped joints.

AI concept: Pressure-treated bottom plate on a basement slab
AI-generated concept

Pressure-treated plates

Any wood touching concrete is treated so it does not rot from ground moisture. Required by code on basement slabs and foundations.

AI concept: Metal joist hangers on a new beam
AI-generated concept

Simpson Strong-Tie hardware

Joist hangers, post bases and straps from Simpson Strong-Tie hold each connection exactly the way the engineer's letter calls for.

AI concept: Fire blocking installed between studs
AI-generated concept

Fire blocking

Solid wood or rated foam that closes gaps between floors inside the walls, so a fire cannot race up through the house unchecked.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Get my framing estimate with these guarantees

Who is in your house

A framing lead and a second framer, with an engineer behind every beam.

Structural work is done by people you meet first, all background-checked, and the engineer who sizes your beam signs the letter the inspector reads.

Framing lead

Framing lead

Reads the loads, runs the crew and meets the building inspector.

Second framer

Second framer

Builds the shoring, cuts studs and plates, and keeps dust contained.

Structural engineer

Structural engineer

Sizes beams, posts and footings and signs the letter for the permit.

Illustrative project scopes

Framing: scope and budget examples.

Planning examples with illustrative budgets and durations. These are not completed customer jobs, invoices or promises about your project.

AI concept: Bearing wall, flush LVL beam
AI-generated concept

Bearing wall, flush LVL beam

Example budget
$14,600
Example duration
6 days
Record type
Illustrative scope
AI concept: Basement framed, 900 sq ft
AI-generated concept

Basement framed, 900 sq ft

Example budget
$21,300
Example duration
2 weeks
Record type
Illustrative scope
AI concept: Wider opening, new header
AI-generated concept

Wider opening, new header

Example budget
$3,900
Example duration
2 days
Record type
Illustrative scope

Your house is not average

Your structure is different. Here is how the framing price changes for it.

Every framing estimate starts from what the wall carries, then moves for the house around it. Pick the case that matches yours.

An older house

Older framing is often rough-sawn and bigger than today's lumber, with plaster on both sides. We match sizes with shims and sister boards, test for lead paint before cutting, and plan for more patching than in newer homes.

Price framing in my older house

Opening up a whole floor

Taking out two or more walls often means one long beam and posts that land on new footings. The engineer designs it as one system, so it goes through a single permit and a single inspection instead of several separate ones.

Plan my open floor plan

A condo or townhouse

Shared walls and floors belong to the association. We confirm with the board which walls are yours to change, bring the approval letter to the permit office, and never touch a wall between units without it in hand.

Get my condo framing estimate

A new bedroom or office

Splitting a big room into two needs a wall, a door and often a closet. We check the egress window, the heating and the outlets for the new room, so it legally counts as a real bedroom when you sell the house later.

Price a wall for a new bedroom

Framing damaged by a leak

Soft studs and sagging joists near an old leak have to be cut out, not covered over. We find where the water came from, replace the damaged framing and let the area dry out properly before anything is closed back up.

Get my framing repair estimate

A basement in a cold climate

Cold foundation walls sweat in winter. We leave a gap behind the studs, use rigid foam insulation against the concrete where code asks for it and treated plates on the slab, so the new walls stay dry and warm.

Frame my basement for a cold climate

Past work without a permit

Walls built by a past owner without a permit can hold up a sale at the last minute. We open them, check them against code, fix what fails and get a permit on record, so the buyer's inspector has nothing to flag.

Get unpermitted framing checked

A tight deadline

A move-in date or a new baby leaves little slack in the schedule. We order the beam and file the permit while you are still choosing finishes, so framing starts the week the permit clears and takes days, not weeks.

Schedule my framing on a deadline

What this service is

Framing, defined the way we permit and price it.

Framing is the structural wood or steel skeleton of a house: the studs, plates, headers, beams and joists that hold up walls, floors and roofs. In a remodel, framing means building new walls, widening openings, replacing load-bearing walls with beams and framing basements for finishing. ProBuild Remodeling performs it with licensed framers, engineers where required and a permit on record.

The service covers load assessment, engineering letters, permits, temporary shoring, removing and building walls, setting beams, posts and footings, fire blocking and the framing inspection. Moving wires, ducts and pipes inside the wall is included and done by licensed trades. Drywall, flooring and paint repair are quoted as separate lines so you can compare them. New additions and roof framing are priced on their own pages.

It is for homeowners opening up a floor plan, adding a bedroom or office, finishing a basement or repairing framing damaged by water or past work. It is not for hanging a heavy mirror or a TV mount, which a handyman visit covers, and not for new houses built from the ground up.

The words you will see on your framing estimate

Load-bearing wall
A wall that holds up a floor, ceiling or roof above it. Removing one needs a beam and posts to carry that load.
Header
A short beam over a door or window opening that carries the weight above it to the studs on each side.
LVL beam
Laminated veneer lumber: thin wood layers glued into a strong, straight beam. The most common beam in remodels.
Flush beam
A beam set up inside the ceiling, level with the joists, so no beam hangs down into the room.
Shoring
Temporary walls or posts that hold up the ceiling while the old wall is out and before the new beam is set.
Point load
Weight concentrated on one spot, such as under a post. It needs solid bearing all the way down to a footing.
Sistering
Fastening a new board alongside a damaged or cut joist so both share the load and the floor stops sagging.
Framing inspection
The building inspector's check of the structure before walls are closed. Drywall cannot go up until it passes.

Questions we hear about framing

The eight framing questions homeowners ask before a wall comes out.

How much does it cost to remove a load-bearing wall?

Most load-bearing wall removals run $8,000 to $22,000, including an engineer's letter, the beam, posts, permit and inspection. A flush beam hidden in the ceiling costs more than one that hangs below it. Drywall, floor and paint repair are usually 25 to 40 percent of the total.

How can I tell if a wall is load-bearing?

Look at what sits on it. If floor or ceiling joists rest across the top of the wall, or if a beam or wall lines up directly below it in the basement, it very likely carries load. Only an on-site look, and an engineer for bigger spans, can confirm it.

Do I need a permit to frame a new wall?

In most places, yes for any wall that changes a room's use, removes or alters structure, or adds a bedroom. Many towns exempt a simple non-bearing partition. We check your local rule at the visit and file the permit when one is needed.

Do I need a structural engineer to remove a wall?

For a load-bearing wall, usually yes. The engineer sizes the beam, the posts and the footings and writes a stamped letter the permit office asks for. It typically costs $500 to $1,200 and takes one to two weeks.

How long does it take to frame a basement?

Framing an average 800 to 1,000 square foot basement takes one to two weeks, including soffits around ducts and the egress opening. Electrical and plumbing rough-in follow, then the rough inspection before insulation and drywall.

Can a beam be hidden in the ceiling?

Often, yes. A flush beam sits between the joists so the ceiling stays flat. It needs hangers for every joist and sometimes a deeper or steel beam, so it costs more. A dropped beam that shows below the ceiling is simpler and can be wrapped in trim.

Should I use wood or steel studs for basement walls?

Wood is standard and easier for hanging cabinets and trim; the bottom plate must be pressure-treated where it touches concrete. Steel studs do not rot and stay straight, but they cost more to trim out. We recommend wood for most basements.

What happens to the floor where a wall was removed?

There is a strip of missing flooring where the wall stood. We patch it with matching boards when available, or recommend running new flooring through both rooms. The estimate shows both options so the floor does not become a surprise.

Framing near you

Your remodeling address, within our service area.

Framing is done by local crews licensed in your state, with permits filed at your city or county and license numbers listed state by state.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free framing estimate

Send your answers now. Know what the wall carries within 24 hours of the visit.

A framing lead reads your answers, texts within 5 minutes during business hours and sets the visit to look above and below the wall.

Text my quote Call now

Images marked as AI concepts illustrate remodeling ideas, materials and conditions. They are not photographs of completed ProBuild projects or verified before-and-after pairs.

Your remodeling question

Discuss Framing

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.