Roof replacement · Licensed & insured · Full tear-off

Roof replacement, torn off to the deck and finished in days.

A roofing supervisor walks every slope, photographs what is up there and sends a written estimate in three tiers within 24 hours. We strip the roof to the wood, replace soft decking at a per-sheet price fixed in the contract, and most houses are roofed in one to three days.

Text one photo of your roof from the street. A licensed roofing supervisor answers within 5 minutes during business hours, with no salesperson in between.

  • $16k–$28kTypical full system
  • 1–3 daysMost tear-offs
  • 4.9410 reviews
  • 24hWritten estimate

What happens after you text us

A roofer who climbs roofs answers. You get dates, not a pitch.

Here is a typical first exchange. You tell us how old the roof is and what you see, we ask for one photo from the street, and you leave the chat with an inspection time and the day your written estimate arrives.

  • The supervisor who inspects your roof is the one texting you
  • One photo from the street shows pitch, layers and wear
  • Inspection time and estimate day agreed in the same thread
Text me my quote

What a roof replacement costs

A new roof costs $10,000 to $55,000. Most homes land between $16,000 and $28,000.

Figures assume a 2,000 square foot two-story house with a walkable pitch at current labor rates. Size, steepness, the number of layers to remove and rotten decking move the price most. Each tier is a complete roof, not a teaser.

Tear-off and re-roof

$10k–$18k

One layer removed, architectural shingles installed. One to two days. For decks that are still sound.

  • Tear-off of one layer to the deck
  • Synthetic underlayment
  • Ice and water shield at the eaves
  • Architectural shingles
  • New drip edge and pipe boots
  • Magnetic nail sweep and haul-away
Get my re-roof estimate

Premium or metal roof

$28k–$55k

Designer shingles or standing seam metal, full deck and flashing work. Three to six days on site.

  • Everything in Full roof system
  • Designer or impact-rated shingles
  • Or standing seam metal panels
  • Painted metal or copper flashing
  • Wider ice barrier in cold zones
  • Permit and final inspection
Get my premium roof estimate

Price your new roof in ten seconds

Choose a tier, the footprint of the house and what the house is like. The number shifts with every choice, drawn from the tiers our roofing supervisors quote.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$16,000 to $28,000

Turn this range into a written roof estimate

Where the money goes

Labor and shingles take six dollars in ten. Decking and flashing decide how long it lasts.

Averages from our recent full tear-offs. A low bid usually saves on the lines you cannot see from the street: underlayment, flashing and how many deck sheets are included. Ask any roofer to break those out.

Get my itemized roof estimate
Worn, curling shingles on one slope next to a newly replaced roof on the neighboring house
Wear on every slope points to replacement; one bad spot points to repair

Repair or replace your roof

Replace the roof when wear is everywhere. Repair it when the problem is in one spot.

Plenty of roofs we inspect do not need replacing yet. We walk every slope and write down which of these is true, with photos, so the decision rests on what is actually up there.

If this is trueWe recommend
Shingles are curling, cracked or bald on most slopesReplace
The leak traces to one pipe boot, vent or chimneyRepair
Three-tab shingles are more than 20 years oldReplace
Wind took a few shingles and the rest lie flatRepair
The deck feels soft underfoot in several placesReplace
The roof is under 12 years old and wears evenlyRepair

How long it takes

Most roofs take one to three days on site, and the yard is swept every evening.

Your start date lands one to three weeks after signing, depending on the permit office and shingle delivery. We watch the forecast and only open as much roof as the crew can seal the same day.

Roofing supervisor measuring a roof slope

Before day one

Inspection and permit

Every slope walked and photographed, three-tier estimate, shingle color chosen, permit filed with your town.

Crew removing old shingles down to the wood deck

Day one morning

Tear-off to the deck

Tarps protect shrubs and siding, old layers come off, every deck sheet is walked and soft ones are marked.

Roofer installing architectural shingles over new underlayment

Days one and two

Dry-in and shingles

Ice and water shield at eaves and valleys, synthetic underlayment, then shingles laid course by course.

Finished roof with ridge vent and a clean yard below

Final day

Flashing and cleanup

Ridge vent, pipe boots and flashing finished, magnet sweep of the yard, inspection, photos sent to you.

What we find once the shingles are off

On one roof in three, part of the wood deck underneath is soft.

These six problems came up most often on our recent tear-offs. Each is photographed and priced per unit in the contract before work starts, so a rotten sheet of decking never turns into a surprise bill.

38%

An attic with too little ventilation

Hot, stale attics bake shingles early and cause ice dams. We balance soffit intake with ridge exhaust so the shingle warranty stays valid.

34%

Soft or rotted deck sheets

Usually near valleys, chimneys and eaves. We replace each sheet at the per-sheet price in your contract and send you the photos.

29%

Two or more old layers of shingles

Building codes do not allow a new roof over two existing layers. We strip every one so the new shingles nail into wood.

26%

Missing or rusted chimney flashing

The leak source we see most. We cut new step and counterflashing into the mortar joints instead of trusting a bead of caulk.

21%

Bathroom fans venting into the attic

Warm, wet air rots the deck from below. We extend the duct to a roof or wall cap so the new roof is not damaged from inside.

17%

No drip edge along the roof edges

Water curls behind the gutter and rots the fascia board. We install metal drip edge on every eave and rake, as current code requires.

What your roof is made of

Every layer of the roof is named in your estimate, not just the shingle color.

Two quotes can use the same shingle and still be very different roofs. The difference is in the layers underneath, which is why ours lists the brand, product and quantity of each.

Architectural asphalt shingles on a pitched roof

Architectural shingles

GAF Timberline HDZ, Owens Corning Duration or CertainTeed Landmark. Thicker than three-tab, rated for high wind and 25 to 30 years.

Synthetic underlayment rolled over a roof deck

Synthetic underlayment

A woven sheet under the shingles that keeps the deck dry if a shingle blows off. It replaces felt paper, which tears and wrinkles in sun.

Ice and water shield membrane along a roof eave

Ice and water shield

A rubberized membrane at the eaves, valleys and around chimneys that seals around each nail. It stops ice dams and wind-driven rain.

New OSB decking sheets nailed to roof rafters

Plywood or OSB decking

Replacement sheets are 7/16 inch OSB or 1/2 inch plywood to match your deck, nailed to the rafters so the finished roof stays flat.

New chimney flashing and a lead pipe boot on a roof

Flashing and pipe boots

Aluminum or painted steel step flashing, new chimney counterflashing, and lead or silicone pipe boots that outlast the rubber kind.

Continuous ridge vent along the peak of a new roof

Ridge and soffit vents

A continuous ridge vent paired with soffit intake so the attic breathes. Common products are GAF Cobra and Owens Corning VentSure.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Get my roof estimate with these guarantees

Who is on your roof

One supervisor and one roofing crew, from tear-off to final sweep.

You meet the supervisor at the inspection and the crew lead on the first morning. Everyone is background-checked, harnessed on steep slopes and working for us, never picked up for the day.

Roofing supervisor

Roofing supervisor

Inspects the roof, writes the estimate and texts you daily.

Roofing crew lead

Roofing crew lead

Checks every deck sheet and signs off each slope before shingles.

Flashing specialist

Flashing specialist

Cuts in chimney, wall and skylight flashing by hand.

Recent roofs, with the real numbers

Three roofs we replaced, each priced and dated in the contract.

Ranch, one-layer tear-off

Ranch, one-layer tear-off

Final price
$12,400
Duration
1 day
Location
City, ST
Colonial, two layers removed

Colonial, two layers removed

Final price
$23,900
Duration
2 days
Location
City, ST
Cape Cod with dormers, metal

Cape Cod with dormers, metal

Final price
$41,600
Duration
5 days
Location
City, ST

Your roof is not average

Your roof has its own story. This is what changes the number on it.

Each replacement starts from the three tiers above, then shifts for pitch, access, climate and what an insurer or buyer needs to see. Pick the case closest to yours.

Insurance is paying for it

When a covered storm caused the damage, the policy may pay for the roof minus your deductible. We document every slope, meet the adjuster on the roof and write the estimate in the line items insurers use.

Get my insurance roof estimate

Selling the house soon

A buyer's inspector will flag a tired roof, and the buyer will ask for a credit larger than the roof costs. We write a condition report first, then a replacement price only if the report says you need one.

Get my pre-sale roof report

An older house

Older roofs often hide plank decking with gaps, several shingle layers and no drip edge. Your estimate prices new sheathing over the planks as its own line, so you can see exactly what the age of the house adds.

Get my older-house roof estimate

Snow and ice country

Where ice dams form, we run ice and water shield at least six feet up from the eaves, check attic insulation and venting, and schedule tear-offs on days above 40 degrees so the shingles seal down properly.

Get my cold-climate roof estimate

Hot sun most of the year

Heat ages shingles from above and from the attic below. We quote reflective cool-roof shingles, correct the attic ventilation, and start crews at first light so soft shingles are not scuffed in the afternoon heat.

Get my hot-climate roof estimate

Near the coast

Salt air and hurricane winds call for ring-shank nails, six nails per shingle, taped deck seams and stainless or aluminum flashing. We follow the high-wind nailing pattern your county requires and include the inspection report.

Get my coastal roof estimate

On a tight budget

The lowest honest price keeps the full tear-off, the ice barrier and new flashing, and saves on the shingle line instead. We show what each downgrade saves and which ones would void the manufacturer warranty.

Get my budget roof estimate

A rental property

Tenants can stay home during a tear-off. We arrange access with you by text, hand tenants a written notice with the dates, protect cars and yards, and send you before and after photos to keep for your insurer.

Get my rental roof estimate

What this service is

Roof replacement, explained the way we price it.

Roof replacement is the removal of every existing roofing layer down to the wood deck, followed by repair of damaged decking and installation of new underlayment, flashing, ventilation and roofing material. ProBuild Remodeling performs it as a licensed contractor under one contract, with the permit pulled in our name and a named crew on the roof.

The service covers tear-off and disposal, decking repair at a stated price per sheet, ice and water shield, underlayment, drip edge, all flashing, pipe boots, ridge and soffit ventilation, and the new shingles or metal panels. It does not include gutters, siding or attic insulation unless they are written into the scope as separate lines.

It is for homeowners whose roof is worn across most slopes, has leaked in several places, or failed an insurance or pre-sale inspection. It is not for a roof with one leak or a handful of missing shingles, which a repair fixes for a fraction of the price, and it is not for commercial flat roofs.

The words you will see on your roof estimate

Square
The unit roofers price by: 100 square feet of roof surface. A 2,000 square foot house usually has 20 to 30 squares of roof.
Tear-off
Removing every old layer of shingles and underlayment down to the deck, so the new roof is nailed into clean, solid wood.
Decking
The plywood or OSB sheets nailed to the rafters that carry the roof. Soft or rotted sheets are replaced at a set price each.
Drip edge
A bent metal strip along the eaves and rakes that sends water into the gutter instead of behind it into the fascia board.
Ice and water shield
A self-sealing membrane laid at eaves and valleys that keeps melting ice and blown rain from backing up into the house.
Step flashing
Small L-shaped metal pieces woven into each course of shingles wherever the roof meets a wall or the side of a chimney.
Ridge vent
A continuous vent along the peak that lets hot, damp attic air escape, working together with intake vents at the soffits.
Pitch
Roof steepness, written as inches of rise per 12 inches of run. Roofs steeper than 8/12 need extra safety gear and cost more.

Questions we hear on every roof call

Eight questions homeowners ask before replacing a roof.

How much does a roof replacement cost?

Most asphalt roofs on a 2,000 square foot house cost $16,000 to $28,000 with a full tear-off, new flashing and some decking. A simple one-layer ranch can come in near $10,000. Designer shingles or standing seam metal run $28,000 to $55,000.

How long does a roof replacement take?

One to three days on site for most houses, up to five or six for steep, cut-up or metal roofs. Add one to three weeks before that for the permit and material delivery. Rain days push the start, never the quality of the dry-in.

Can you put new shingles over the old ones?

Some codes allow one overlay, but we do not recommend it and never do it over two layers. An overlay hides soft decking, traps heat that shortens shingle life, and often limits the manufacturer warranty. A tear-off lets us see and fix the wood.

How do I know if my roof needs replacing or just a repair?

Wear on every slope, curling or cracking shingles, bald spots with no granules and a soft deck point to replacement. One leak at a pipe, vent or chimney, or a few shingles lost to wind, points to repair. We write down which applies after walking the roof.

What happens if the roof deck is rotten?

The crew marks every soft sheet during tear-off and photographs it. Replacement sheets are billed at the per-sheet price already in your contract, so you know the cost of rot before the job starts. The Full roof system tier includes up to ten sheets.

Do I need to be home during a roof replacement?

No. We need access to an outdoor outlet, the driveway for the dumpster and your garage door closed. Expect hammering from 7 in the morning to late afternoon. Pets are happier away from the house on tear-off day, and attic items should be covered.

Will a new roof lower my insurance premium?

Sometimes. Several insurers give a discount for a new roof or for Class 4 impact-rated shingles in hail states. Ask your agent before choosing the shingle, and we add the product certificate and final inspection to your closing packet.

What time of year is best to replace a roof?

Late spring through fall, when shingles seal well in the warmth. We roof in winter above 40 degrees with hand-sealing where needed. Booking in late winter usually gets you an earlier start date than waiting for the busy season.

Roof replacement near you

Your remodeling address, within our service area.

Every roof is replaced by a local crew working under the license of its state and the wind and ice rules of its county. License numbers are listed state by state.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free roof replacement estimate

Send your answers now. Get three roof prices in writing within 24 hours.

A roofing supervisor reads your answers, texts you back within 5 minutes during business hours and books the inspection in the same thread.

Text my quote Call now

Your remodeling question

Discuss Roof replacement

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.